It was a summer of big changes at Underhill - 500 square feet of green roof installed and growing, 1500 square feet more of concrete floor slabs poured, the fireplace & chimney built, and many materials acquired for future steps, including 500 square feet of roof planking salvaged from a pool hall in Queens.  And we're not done yet.  The walls of the study are being built from block and stone, and in some places have reached 8 feet above the footings.  These are almost the only structural walls still to be done.  These steps have been completed thanks to the help of many amazing friends and sponsors.  More to come!